Full-time

Set-Up Technician - Milwaukee, WI - 3rd Shift

Posted on 09 December 25 by Alex Harning

  • Milwaukee, WI
  • $22 - $26 per Hour
Logo

Powered by Tracker

Job Description

Set-Up Technician - Milwaukee, WI - 1st/2nd Shift

  • Location: Milwaukee, WI
  • Shift: 1st and 2nd shift available (7am-3pm & 3pm-11pm)
  • Pay: $22-$26/hour

Key Responsibilities
  • Install and connect molds on production presses, including proper water line setup.
  • Remove molds and parts from previous jobs and prepare machines for the next production run.
  • Safely operate overhead cranes, forklifts, and related equipment.
  • Purge machines using the appropriate materials and shut down equipment correctly.
  • Maintain proper routing and securing of water lines to prevent damage or leaks.
  • Keep workstation clean and return tools and supplies to proper storage areas.
  • Wear required PPE and follow all safety and quality procedures.
  • Communicate equipment or process issues to the supervisor.
Qualifications
  • High school diploma or equivalent required.
  • Prior mold setup or plastics processing experience preferred.
  • Forklift certification or ability to complete training.
Benefits
  • 401k w/ match
  • Health/Dental/Vision insurance
  • PTO
  • Paid Holidays
  • Gain-sharing profit bonus

#LP

Job Information

Rate / Salary

$22 - $26 per Hour

Sector

Not Specified

Category

Not Specified

Skills / Experience

Not Specified

Benefits

Not Specified

Our Reference

JOB - 5424

Job Location